Chevron – Wheatstone Upstream Feed Study

The Wheatstone Upstream project is part of the greater Chevron Wheatstone project and was in the final phase of FEED when K2 was requested to undertake a high level and holistic isolation, draining and purging study.

Leighton Offshore Pte Ltd – Iraq Crude Oil Export Expansion Project

The Crude Oil Export Facility of Southern Iraq currently exports approximately 1.8 MMBOPD from its offshore terminals.

Murphy Sarawak Oil Co. Ltd - Warehouse and Inventory Control

K2 Technology provided technical support services and solutions to the Murphy Sarawak Oil Company Limited (MSOCL) warehouse and logistics facility.

Oceaneering International Inc. – Ocean Legend Facility

K2 Technology Pty Ltd was contracted by Oceaneering International Inc. (OII) to provide Operations and Engineering support to the Ocean Legend facility from 2001 up until the facility was decommissioned in 2011.

Project Management System

K2 Technology was contracted to produce a corporate standard extensible database system for global use for a leading blue-chip Australian resources company.

TagMan Asset Auditing

K2 Technology was contracted to help with an asset audit that had tight timeframes.

The assets were supposed to have barcode labels and an existing asset list was available.

Woodside Energy Limited - Angel Project

Woodside Energy Limited (WEL) engaged K2 in 2005, to develop detailed work-scopes for the identification and implementation of the O&M requirements supported by detailed cost, time and resource (CTR) requirements.

Woodside Energy Limited - OKHA FPSO Project

K2 Technology provided a skilled team of personnel to assist with both the build phase and start-up phase of Woodside's OKHA FPSO Project specifically delivering Operations and Maintenance Technical expertise.

Woodside Energy Limited - Reliable Materials Management (RMM) Project

K2 was engaged to identify spare parts associated with equipment identified by the client as safety- and production-critical in operation across five facilities.

Woodside Energy Limited – North Rankin Bravo (NRB)

The NRB platform to be operated by Woodside Energy Limited (WEL) is a five billion dollar project designed to extend the North West Shelf North Rankin field life production into 2040.

Woodside Energy Limited – NR2 Project

K2 Technology have successfully completed the operability and maintainability activities essential to the production readiness and start-up phases of Woodside’s North West Shelf Projects A$5 billion North Rankin Redevelopment (NR2) Project.

Woodside Energy Limited – NRA Optimisation Project

K2 was approached by Woodside in late 2011 to perform a Preventive Maintenance (PM) optimisation study on the offshore NRA facility.