Case Studies
Woodside Energy Limited – NRA Optimisation Project
K2 was approached by Woodside in late 2011 to perform a Preventive Maintenance (PM) optimisation study on the offshore NRA facility.
K2 was approached by Woodside in late 2011 to perform a Preventive Maintenance (PM) optimisation study on the offshore NRA facility.